
Old Demolition Wood, New Insulation: The Circular Route Researchers Are Testing
A June 2026 study asks whether clean construction and demolition wood can become wood-fibre insulation instead of waste.
FrameVerk field notes
Practical guidance for planning, designing and building timber frames, organized to help you find the next useful answer.
Browse every published FrameVerk article, ordered from newest to oldest.

A June 2026 study asks whether clean construction and demolition wood can become wood-fibre insulation instead of waste.

Stora Enso’s first fully electric delivery programme carries roughly 400 m³ of CLT to ByggPartner’s new timber headquarters in Borlänge.

A July 2026 study tests how post-tensioned CLT rocking-wall towers respond to intense localized downburst winds.

A June 2026 review found that moisture, maintenance and obsolescence matter more than a mythical fixed lifespan for timber buildings.

WoodWorks’ project count, USDA material-use data and a new technical reference guide together show a US market growing in scale—and in the infrastructure needed to deliver it.

The Freedom Mobile Arch amphitheatre is scheduled to open in 2026 beneath a 345 ft hybrid timber-and-steel roof. The project moves engineered wood beyond familiar grids and into the demanding geometry of a major public venue.

Convert timber dimensions or known volume into m³, ft³, board feet, estimated weight and material cost—with metric and imperial examples.

IberoLam Timber & Technology has begun work on a new factory in Valderrubio, moving a University of Granada research initiative toward commercial off-site construction.

Galicia’s new 2026 funding round supports homes, apartment buildings and business premises that use wood structurally, turning material choice into a regional industrial policy.

Germany’s revised Model Timber Construction Guideline extends timber-panel construction to Building Class 5, but adoption by the federal states and strict fire-safety detailing still matter.

TU Dresden’s new federally funded research project will test how structural timber can be dismantled, graded, reprocessed and designed into safe new buildings.

The 14-home project in Burjassot combines certified engineered timber, off-site construction, Passivhaus strategies and high energy ratings.

The Richard Towers retrofit uses a lightweight steel–timber extension and 300 cubic metres of CLT to add two storeys to an existing 16-storey tower, showing how mass timber can unlock vertical reuse.

Portland’s planned Cleveland High School includes nearly 870,000 board feet of mass timber. Here is how that quantity converts—and what it cannot tell us.

Four Korean standard-house models produced lower material-stage emissions for timber than converted concrete alternatives. The result is useful, but geometry, service life and regional data limit how far it can travel.

The EU now has a common framework for calculating the life-cycle global warming potential of new buildings. Here is what changes, when disclosure begins, and why an A1–A3 material estimate is only the starting point.

CLT, glulam, DLT and NLT are not interchangeable. Learn how product type, species, grade, bonding and moisture affect a useful quantity estimate.

A 2026 listening study turns simulated footsteps and jumps into design evidence for quieter cross-laminated timber floors.

A Dartmouth feasibility study modelled two 12-storey residential schemes. Timber reduced the study’s A1–A3 structural carbon and structural programme, while carrying a higher estimated project cost.

The civic building’s project team reports lower structural embodied carbon and a shorter programme. The useful lesson lies in the hybrid system, comparison boundary and assumptions—not a universal percentage.

New CAT-scan research maps moisture paths inside rain-exposed CLT and explains why surface readings are not the whole story.

Vancouver’s ten-storey timber office uses perimeter glulam braces and self-centering connections to manage earthquake forces without a conventional concrete core.

A new modelling study tests whether prefabricated wood-fibre insulated panels save energy from cold Canada to hot-humid regions.

May 2026 tests compare wooden-dowel capacity with design models and show where timber-only connections offer circular potential.